HOME    |    WORKS    |    PRODUCT CATALOGUES    |    CONTACT US
  our range

CONCRETE BLOCKS

 

Dense concrete blocks

 

Hollow and cellular

 

Fibotherm insulating blocks

 

Stowlite lightweight blocks

 

Midi blocks

 

MACRO blocks

 

Generation 2 MACRO blocks

 

T-joist first floor profile blocks

 

Soap bar blocks, coursing and slip bricks

 

Design your own block

 

Padstones

 

T-Joist first floor recessed profile blocks

 

Foundation (trench) blocks

PAVING SLABS

 

Commercial slabs

 

Patio paving and wet cast edgings

 

Tactile and patterned paving

 

Vintage/traditional and decorative

 

Permeable paving

KERBS, EDGINGS & CHANNELS

FLOORING

 

T-joist flooring

 

Hollowcore flooring

 

Flooring blocks

 

Accessories

 

On-site instructions for pre-cast joists

 

On-site instructions for pre-cast hollowcore flooring planks

FLOORING SOLUTIONS

 

For separating floors to help satisfy Robust details part E

 

E-FC-1, 4 and 5

 

E-FC-8, 9 and 11

 

E-FC-1(RSC) and 9(RSC)

 

E-FC-6 and 7

For domestic floors

 

D1, D2 and D5

 

D3 and D4

 

For ground floors to help satisfy Part L

 

L1, L2, L3 and L4

PRE-CAST CONCRETE LINTELS

EDGING, COPING, BOLLARDS AND PILLAR CAPS

 

Edging, bollards & pillar caps

 

Wall coping

FENCING

 

Fencing products

 

Semi-dry economy fencing

 

Portable post bases

 

Concrete barriers

 D3 and D4 ceiling finish optional (not shown)

Stowell solutions for domestic floors

D3

• precast concrete plank

 
Structural floor –

Stowell hollowcore HC260 concrete plank

Regulating screed optional (not shown)
A required minimum floor mass of 180 kg/m2 can be exceeded by using Stowell hollowcore 155mm deep HC260 concrete planks (five hole). When grouted a floor mass of approximately 280kg/m2 is obtained before adding toppings, floors and ceilings.

D4

• precast concrete plank

 
Structural floor –

Stowell hollowcore HC300 concrete plank

Regulating screed optional (not shown)
A required minimum floor mass of 180 kg/m2 can be exceeded by using Stowell hollowcore 155mm deep HC300 concrete planks (three hole). When grouted a floor mass of approximately 320kg/m2 is obtained before adding toppings, floors and ceilings.

Stowell Concrete reserve the right to supply HC300 if stock of HC260 is not available
 
Part E (resistance to passage of sound) of the Building Regulations (England and Wales) Section 5: Internal walls and floors for new buildings, requires a minimum floor mass per unit area. For joist* and block the floor mass is 220kg/m2 and for hollowcore concrete planks the requirement is a minimum 180kg/m2.

To satisfy Part E (Resistance to passage of sound) of Building Regulations, England & Wales Section 5: Internal walls and floors for new buildings, both the regulating screed and ceiling finish are optional.

However, to achieve larger spans, a reinforced structural concrete topping needs to be bonded to the units. Please see the load span tables below and guidelines for structural concrete topping applied to reinforced concrete flooring.

* commonly known as beam
All products are available ex works.
Prices on application.
Telephone our sales office for further information and quotations.
DOWNLOAD PDF DATA SHEET
FOR THIS PRODUCT
 

Domestic floor utilising timber & batten only

HC260/HC300 Loadings in kN/m2
Imposed live load 1.5 2.0 2.5
Partition allowance 0.5 0.5 1.0
Finishes & ceilings 0.3 0.3 0.3
  Max clear span in metres
8mm reinforced type A 4.15 4.05 3.80
10mm reinforced type B 4.40 4.30 4.05
12mm reinforced type C 4.55 4.45 4.20
16mm reinforced type D 4.70 4.55 4.35
 
155mm deep Stowell HC260 (shown) or Stowell HC300
 
Joints must be kept clean until concrete is poured

Domestic floor utilising screed

HC260/HC300 Loadings in kN/m2
Imposed live load 1.5 2.0 2.5
Partition allowance 0.5 0.5 1.0
Finishes & ceilings 0.3 0.3 0.3
  Max clear span in metres
8mm reinforced type A 3.80 3.75 3.55
10mm reinforced type B 4.10 4.00 3.80
12mm reinforced type C 4.25 4.15 4.00
16mm reinforced type D 4.40 4.30 4.15
 
65mm screed
 
155mm deep Stowell HC260 (shown) or Stowell HC300
 
Joints must be kept clean until concrete is poured

Domestic floor utilising structural concrete bonded to Stowell hollowcore and propped*

HC260/HC300 Loadings in kN/m2
Imposed live load 1.5 2.0 2.5
Partition allowance 0.5 0.5 1.0
Finishes & ceilings 0.3 0.3 0.3
  Max clear span in metres
8mm reinforced type A 5.40 5.30 5.05
10mm reinforced type B 6.00 5.85 5.60
12mm reinforced type C 6.40 6.25 6.00
16mm reinforced type D 6.80 6.65 6.45
 
min 70mm
concrete C28/35
max 10mm aggregate
S3 + A142 mesh
Joints must be
kept clean until concrete is
poured
155mm deep Stowell HC260
(shown) or Stowell HC300
These tables refer to simple, uniformly distributed loads only and is only a guide.
*Please see guidelines for stuctural concrete topping applied to reinforced precast concrete flooring.
home  |  works  |  product catalogues  |  contact us

Stowell Concrete Limited, Arnolds Way, Yatton Bristol BS49 4QN
Tel: 01934 834000   Fax: 01934 835474   Email: sales@stowellconcrete.co.uk

site design: carn gerrish creative